Project Description:

Linn-Mar Aquatic Center side elevation

Novak Design Group retained Hall and Hall Engineers to provide design services for a new multilevel aquatic center for Linn-Mar High School located on the east side of their football field which is on the east side of 10th Street in Marion, Iowa. Our work included site design, Storm Water Pollution Prevention Plan preparation and DNR utility permitting, storm water analysis and detention basin design, landscape planning, and preparation of associated contract documents. In addition, we conducted a pool survey to certify dimensions for competitions.

Linn-Mar Aquatic Center front elevation

Due to our strong expertise and history with teaming up with architects, we were a perfect fit to join Novak Design Group’s design team to work closely with their architect’s in order to complete the project successfully and smoothly.