Project Description:

Edgewood Station retail strip

This commercial development included a bank, mixed use retail strip mall with various restaurants. A 250 stall parking lot was constructed to serve the development. The site was a Westdale Mall out-parcel and contained contaminated soils as a result of historically being a dry cleaning service. Soils were remediated to allow the project to be constructed.


An intricate storm water management system was designed to allow a large off-site drainage basin area to pass through the site, while intercepting and detaining on-site run-off. Landscape buffering was incorporated into this project to meet City zoning regulations.